MLCC in green

roosevelt looking north
waldo 15th
5th looking south
community garden
Mt Rainier view
DPD file documents
This is a portion of the documents available in the DPD file on this proposed development. You can see paper versions by visiting the Seattle Municipal Building (20th Floor) and asking to see a copy of the file.

These are electronic reproductions. We've tried to get the best quality, but it is sometimes tough to get a really clean copy. Please note many of these files are often very large size, so they may take a while on slower internet connections. You will need a copy of the free Adobe Acrobat Reader or similar program capable of displaying PDF documents.

The most recent documents posted are at the bottom of the page.

Waldo Hospital Proposed Development Documents
Document Type
DPD
File Date
Comments or Description
Plan Photo 12/2007 Photo of illustration in the building plans showing original siting and height for each of the 39 units.
Plan Photo 12/2007 Photo of illustration in the building plans showing open space diagram, including trees to be saved. This document has errors and the tree icons are not to scale.
Plan Photo 12/2007 Photo of illustration in the building plans showing the originalsetbacks and spacing between structures and lot lines.
Plan Photo 12/2007 Photo of illustration in theoriginal building plans showing color elevation - east facing 15th.
Plan Photo 12/2007 Photo of illustration in the original building plans showing color elevation - facing west towards reservoir.
Plan Photo 12/2007 Photo of illustration in the original building plans showing color elevation - facing south towards 85th.
Plan Photo 12/2007 Photo of illustration in the original building plans showing color elevation - facing north towards 86th.
Plan Photo 12/2007 Photo of illustration in the building plans showing landscaping plan. Icons showing the trees are not to scale.
Plan Photo 12/2007 Photo of table in the building plans showing trees removed (58 - 874' of canopy), trees preserved (47), and trees added (27 - 965' of canopy at maturity) - including species information. Newly installed trees will have 2" caliper. NOTE: The table was incorrect. Fewer than 36live trees will be saved.
Plan Photo 12/2007 Photo of illustration in the original building plans showing north portion of lot non-permeable surface and drainage.
Plan photo 12/2007 Same as above, but south portion of the lot
Plan photo 12/2007 Photo of illustration in the original building plans showing ground floor dimensions for each unit.
Plan photo 12/2007 Same as above, second story.
Plan Photo 12/2007 Same as above, third story/roof dimensions.
Document 12/1/2007 SEPA Environmental Checklist filed by developer
Document 3/2007 Prescott's arborist's tree survey
Document 12/2007 Prescott's habitat assessment
Document 1/2008 Prescott's eagle habitat assessment
Document 1/2008 Geological survey and report
Document 1/2008 Prescott memo on water pressure and service
Document 1/2008 Traffic report summary (Raw data in this document)
Document 1/2008 Prescott Asbestos survey dated 3/27/2007
Document 2/6/2008 Prescott Radon/Lead lab analysis results
Document 2/1/2008 DPD "Correction Notice" requesting traffic detail & climate checklist
Document 2/6/2008 Prescott building Environmental Report Text (dated 3/2007)
Document 2/6/2008 Prescott building Environmental appendices/tables (large)
Document 3/3/2008 Prescott's packet for March 3, 2008 Design Review Board meeting (large file - 9100kb)
Document 2/27/2008 Maple Leaf Community Council's official comment and SEPA checklist response letter.
Document 2/18/2008 Independent Arborist Report - Tina Cohen, certified arborist
Document 3/13/2008 Another tree survey, includes corrected tree retention table
Document 3/6/2008 Climate change (Greenhouse gas) checklist (spreadsheet here). (Has errors)
Document 4/7/2008 Proposed design and site layout (link to large PDF on Seattle.gov)
Document 4/3/2008 An accurate perspective of the bulk and scale of the proposed development as seen from the sidewalk on 85th. The graphic in this document was originally presented by us at the 3/3 Design Review Board.
Document 3/24/08 New report from developer's arborist
Document 3/26/08 Developer's response to traffic/pedestrian concerns brought up by DPD and during our March 10 traffic/pedestrian meeting
Document 4/9/2008 Updated report on lead, asbestos, and other toxics potentially released during demolition.
Document 5/1/2008 Mayor Nickels' DPD decision on the SEPA (EIS) determination
Document 5/15/2008 Maple Leaf's appeal of the DPD Determination of Non-Significance
More Documents   More documents related to the decision appear on this page

Questions?
Click here to e-mail Save Waldo committee head David Miller

 

Click here to join an email list